Skip to content
Get the Sunday chart

Chart library

Every chart we publish, with its source and data. Free to republish under CC BY 4.0: just credit Chartichoke and link back.

13 charts

Data centre electricity use, forecastAustralia’s main grid (NEM), terawatt-hours a year
02040602025–262029–302035–36High-growth case ~52 TWh5 TWh15 TWh34 TWh
Source: AEMO, 2026 Electricity Statement of Opportunities. Solid line: Step Change (central). Dashed: high data centre growth sensitivity. Smoothed between AEMO’s published years.PNGCSV
Embed
From the story →
The forecast keeps jumpingAEMO’s data centre forecasts, published a year apart (TWh a year)
2025 forecast, for 2034–35
21.4 TWh
2026 forecast, for 2035–36
34 TWh
Source: AEMO 2025 ESOO (via iTnews) and AEMO 2026 ESOO. Last year AEMO did not expect 34 TWh until 2049–50.PNGCSV
Embed
From the story →
Almost every home in two statesElectricity use, TWh a year
Data centres, 2035–36 (forecast)
34 TWh
Every home in NSW and Victoria, today
~38 TWh
Source: AEMO 2026 ESOO; household comparison as reported by ABC News (Aug 2026).PNGCSV
Embed
From the story →
Requests are 30× what is connectedData centre grid connections, main grid (NEM), gigawatts
Connection requests, June 2026
66.9 GW
Connected and operating, early 2026
2.2 GW
Source: AEMO 2026 ESOO, as reported by Data Centre Magazine. 66.9 ÷ 2.2 ≈ 30.PNGCSV
Embed
From the story →
The queue more than doubled in a yearData centre projects seeking a grid connection, main grid (NEM)
A year earlier
97 projects
Now
225 projects
Source: AEMO 2026 ESOO, via SolarQuotes and Data Centre Magazine. More than 40% of last year’s projects dropped out or slipped back.PNGCSV
Embed
From the story →
One-fifth of NSW’s summer peakTransgrid’s modelled data centre peak demand in NSW by 2035
20%

of NSW’s maximum summer demand could come from data centres by 2035: 3.5 GW, about twice what AEMO assumed.

Each square = 1% of NSW’s maximum summer demand.

Source: Transgrid modelling, as reported by RSM Australia (2026). 3.5 GW, about twice what AEMO assumed.PNGCSV
Embed
From the story →
Melbourne has overtaken SydneyPlanned data centre pipeline, gigawatts
Melbourne10.7 GWSydney7.8 GW
Source: Data Centres Australia and DC Byte, Australian Data Centre Forecast Report (Sept 2026). 31% of the national pipeline is now outside both cities, up from 19% in 2024.PNGCSV
Embed
From the story →
The giants on the drawing boardLargest announced Australian data centre campuses, planned capacity (MW)
All operating data centres today: ~1,600 MW
Western Downs Digital Park, near Dalby (QLD)peak · application lodged
2,160 MW
AirTrunk, Kemps Creek (Sydney)announced
1,200 MW
NEXTDC and OpenAI “S7” (Sydney)announced
550 MW
Goodman “Project Atlas” (Sydney)announced
500 MW
AirTrunk MEL2 (Melbourne)announced
354 MW
Source: Rider Levett Bucknall (2026); AIScale Business; Data Centres Australia and DC Byte. Capacity as announced. Western Downs is a peak figure with an application lodged.PNGCSV
Embed
From the story →
Data centres’ share of major projectsShare of Deloitte’s investment database, by value
2020
7.6%
Now
28%
Source: Deloitte Access Economics, Investment Monitor. $104bn of data centre projects tracked, up four-fold in a year. NSW and Victoria hold 71%.PNGCSV
Embed
From the story →
And it keeps comingAnnual data centre investment in Australia, forecast (US$ billion)
02040US$16.5bnUS$41.6bn20262050
Total by 2050US$703bnin AI infrastructure investment
Source: PwC Global Data Centre Outlook (Sept 2026). Straight line between PwC’s two published years. US$703bn cumulative AI infrastructure investment by 2050.PNGCSV
Embed
From the story →
Who pays for the power?Modelled rise in wholesale electricity prices by 2035 from data centre demand
New South Wales
up to 26%
Victoria
up to 23%
Source: Climate Council (advocacy group), “Clouded Future” (2026), as reported by AAP.PNGCSV
Embed
From the story →
The world is doing it tooData centre electricity use, TWh a year
Australia’s main grid, 2025–26
~5 TWh
World, 2025
485 TWh
World, 2030 (projection)IEA central case
950 TWh
Source: International Energy Agency, Energy and AI; AEMO 2026 ESOO. 950 TWh is a little more than all of Japan uses today.PNGCSV
Embed
From the story →
Who uses the world’s data centre power?Share of global data centre electricity use, 2024
45%
25%
15%
15%
United States
China
Europe
Rest of world
Source: International Energy Agency, Energy and AI. Australia’s ~5 TWh is about 1% of the world’s ~485 TWh (our arithmetic).PNGCSV
Embed
From the story →